martes, 23 de diciembre de 2008

NEW PHOTO SET








10:10 A.M. IN THE MAIN PARAPET




LAMP DESIGN. I WAS THINKING IN AN ONIX STONE DESIGN, SO THE LAMP ITSELF WILL GLOW ORANGE-YELLOW LIGHT.

jueves, 2 de octubre de 2008

SOME PENDINGS...

THIS IS THE HOLE FOR THE SEPTIC POOL. WE NEEDED TO RENT A JACK HAMMER, BUT IT WAS MAINLY SOFT SOIL.
THERE WAS A SITUATION WITH THE LEMON TREE. IT WAS BENDING MORE AND MORE, AND FEW DAYS AGO WE HAD A STRONG WINDY STORM THAT FINALLY CKACKED IT. IT IS STILL ALIVE, BUT MAYBE IT'S HOPELESS...
ANOTHER TROUBLE CORNER: IN THE PLACE OF THE TREE WE NEED TO INSTALL A SEWER CHECKBOX, SHLOMI WILL PASS TROUGH WITH 2 PVC PIPES...PHEW... DON'T WANT TO INSIST, BUT IT IS IMPERATIVE TO MOVE THAT TREE, I THINK THE FUNCTIONALITY OF THE HOUSE IS FIRST.  I PROPOSE YOU TO MOVE IT RIGHT BESIDE THE NITCH. 

viernes, 29 de agosto de 2008

BALCONIES

BALCONIES, BUILDING PROCESS. THEY WERE COPIED FROM AN XIX CENTURY HOUSE
THE LEFT ONE, THEY ARE ENTIRELY MADE OF CONCRETE, THEY'LL HAVE STUCCO FINISHED AND THEY'LL BE PAINTED
BACK FACADE, THE CORNICE IS UNDER CONSTRUCTION
BULL EYE HOLES READY

jueves, 21 de agosto de 2008

DOME AND REPAIRS

ANOTHER VIEW OF THE DOME
RELEVELING THE ROOF AT CASA DEL SOL
TILE CHAMFERS REPAIRED

miércoles, 13 de agosto de 2008

BULL EYE AND DOME

I ASKED THE GUYS TO MAKE A SAMPLE OF THE BULL EYE MOLDING. IT'LL BE SIMULATING WHITE STONE. WHAT DO YOU THINK ABOUT IT?
THE DOME'S WIREFRAME
DOME FINISHED. WE'LL REMOVE THE UNDERPINNING BY FRIDAY

martes, 8 de julio de 2008

STONE FRAME READY

THIS FLOOR LEVEL IS VERY HIGH. WHAT WE SHOULD DO? MAYBE A STEP FROM THE FIRST ROOM TO THE KITCHEN AND STAIRWAY, OR A "BITE" IN THE MAIN DOORWAY FLOOR, TO LET THE DOORS OPEN.
THIS IS THE "BERLIN WALL" BETWEEN DAWN AND US, VERY USEFUL
FINISHES IN THE MAIN TERRACE
WALKWAY TO THE CLOSET
STONE FRAME
DETAIL
THE CURB AT THE END OF THE STAIRWAY. WHAT DO YOU THINK ABOUT A BIG WINDOW HERE + - 1 MTR. WIDE ND 2.5 MTRS. HIGH RIGHT ON THE FUTURE WALL IN FRONT OF US? ALSO, I RECCOMEND YOU A BLIND WALL ON THE FRON OF THE HOUSE.

lunes, 30 de junio de 2008

STONE FRAME, IN PROCESS

THE STONE FRAME, SHOWED PIECE BY PIECE, ALREADY ADJUSTED
THE JAMBS IN PROCESS
VIRGIN AT HER PLACE
THIS IS THE UNDERPINNING OF THE LAST STAIRWAY SECTION. WILL WE MAKE THE CURBE FROM THE LAST STEP?

viernes, 20 de junio de 2008

2ND. STRAINING

2ND. STRAINING, MADE BY HAND
...BUCKET BY BUCKET
...BUT WITH THE SAME QUALITY
THE UPPER BATHROOM, READY TO BE FINISHED


jueves, 5 de junio de 2008

UPPER ARCHES AND THE FIRST WELL READY


THE BACK FACADE IS TAKING SHAPE.
MASTER BEDROOM, READY TO RECEIVE THE BEAMS.
THE GROUND WIRE IS ALSO READY, THE MACHINE DRILLED ABOUT 18 MTS. DEEP, THEN WAS INTRODUCED A HUGE COPPER WIRE.
WOODEN PLANKS FOR THE ARCHES. THE STRAIN IS SCHEDULED FOR TOMORROW





viernes, 23 de mayo de 2008

ROUGH STONE FINISH FOR COLUMNS

THIS IS THE GOOD ONE, THE MARTELINADO FINISH (HAMMERED) IS VERY SIMILAR TO THE ORIGINAL ONES
THE LEFT ONE IS EVEN ROUGHER, BUT THE RIGHT ONE IS BETTER

jueves, 22 de mayo de 2008

A FEW DETAILS

THE STENCIL OF THE CENTER COUNTERTOP IS READY. WE'LL FINISH IT WHEN WE GET THE APPLIANCES TO MARK THE HOLES FOR PLUMBINGS
NICE GLASSBLOCKS ONTO THE ROOF OF THE NEW CLOSET. ITS DRAINAGE FOR RAIN IS ALSO IN MIND. I'M GOING TO GIVE A SINGLE LIGHT FOR THIS.
BY THE WAY, I'M PLACING THE OUTLETS OF YOUR BEDROOM (RIGHT ON THE BED'S BOUREAUS) AT 80 CM. HIGH, IS THAT OK? THEY INCLUDE THE LIGHT KNOBS, TELEPHONE, ETC. SO YOU CAN TURN OFF THE ENTIRE LIGHTS FROM YOUR BED.

viernes, 2 de mayo de 2008

THE NEWER SOTNES AT CASA AZUL

WE HAVE A LITTLE GAP IN THE STAIRWAY, WE CAN COVER IT OR PLACE SOME KIND OF GLASSBLOCK OR WINDOW. THAT WILL GIVE MORE LIGHT TO THE BOTTOM.

THE SANTA BARBARA STONE AND THE PILE WITH ITS COLUMN ARRIVED WELL AT CASA AZUL