jueves, 17 de abril de 2008

COLADO DAY



The truck with 7 m3 of concrete is tail by tail with the pump




The pump supplying concrete onto the slab

Finishing the colado
Extra concrete for straining part of the stairway

A seal from the jacks of the pump. A pair of them broke down the walkway. We'll repair them after the second strain.















No hay comentarios: